Are steel frames expensive?
How Much Do Steel House Frames Cost?
Suppose you're about to start building your dream new home, renovating or commencing another building project. In that case, the decisions you make at the beginning of the build will have short and long-term budget effects.
If you are looking for more details, kindly visit our website.
One of these decisions is what material to use for the house framing, roof trusses and flooring system.
The two most popular house framing options in Australia are steel and timber. Generally, a timber frame is cheaper than a steel frame, but there can be exceptions, depending on the project. Cost shouldn't be the only factor that informs your decision. However, it's still essential, particularly if you're on a tight budget. It would help if you also considered the long-term cost of steel frame vs timber in terms of maintenance and energy efficiency.
If you need to familiarise yourself with the pros and cons of both framing options, read this guide, Timber Frames Vs Steel Frames - What Is The Best Option? to see how they compare and decide which is suitable for your project.
So, after READING that, let's get down to the main costing factors that impact house framing!
How much does a steel house frame cost?
Depending on your location and other considerations, the average cost of a steel house frame in Australia ranges from $1,300 to $2,000 per square metre. Typically a steel frame will cost an extra 10% to 20% over a timber frame due to higher manufacturing and production costs.
Steel frames are still a fairly affordable building material, with many post-building cost benefits, such as; its durability, maintenance free, fire resistance and pest resistance.
Read this guide, Timber Frames Vs Steel Frames - What Is The Best Option? for a complete list of the benefits of Steel Framing.
Note that this article's costs and prices are indicative and should only be used as a guide. They also vary locally and are subject to market forces.
How much does a timber house frame cost?
A timber house frame can cost anywhere from $1,200 to $1,680 per square metre, depending on where you live in Australia or $1,480 per m2 on average.
Choosing a timber frame could save 10% to 20% on your building cost compared to installing a steel frame. You could also save energy in the long term, as timber is more energy efficient. Timber is also a readily available, renewable resource (relatively) that is easy to use. However, timber frames are typically more labour-intensive to install and require higher ongoing maintenance.
So now that you know the rough pricing for both options and a cursory overview of the pros and cons, you're no doubt asking yourself: Should I choose a timber or steel frame?
The True Cost of Cold-Formed Steel v. Wood Framing
Discussions over how different materials affect the total cost of a building surface and resurface throughout the design and planning phases of a construction project. The building owners view of material costs can weigh heavily on the products selected, including the material chosen to frame the structure.
But what is the true cost of the framing material in the final analysis?
The wood industry claims wood framing costs less than other materials. The cold-formed steel (CFS) framing industry, however, focuses on the complete picture and has data to back it up.
A new study conducted by R. A. Smith, Inc., Brookfield, Wis., and sponsored by the Steel Framing Industry Association (SFIA) addresses framing costs on behalf of architects, building owners, and general contractors. The study, Costs to Build with Cold-Formed Steel Versus a Wood-Framed Building, establishes that CFS framing and wood framing cost relatively the same when the cost comparison includes the construction insurance premiums associated with using the selected material.
The true cost of CFS over wood is less than 1%:
Keep reading, because CFS framing may cost even less than wood framing for a variety of factors.
Study of two identical buildings
Costs to Build with Cold-Formed Steel Versus a Wood-Framed Building examines the cost of two identical buildings. One building design uses wood framing. The other features CFS.
Building design¹:
- 49,900 SF mixed-use, multi-family residential
- First-story, non-combustible (composite steel and concrete) podium
- First floor parking and retail
- Residential units on levels 2-5
- Rooftop penthouse
The project was designed with both systems fully engineered and drawn in contract document form. In-place construction costs were determined separately for the total building using both wood and CFS framing for theoretical locations in suburban Chicago, Ill., and Morristown, N.J.
The contract document for suburban Chicago compared only the hard construction costs associated with using the two types of framing materials.
The contract document for Morristown, N.J., included framing costs and an insurance cost impact study of the same building design.² The suburban Chicago building cost figures were adjusted for the New Jersey market to account for geographical differences and inflation, using RSMeans construction cost data and the US Consumer Price Index.
The actual final bid values were used for the total cost of the project as built, with separate breakout estimates provided as indicated in the table below.
Cost of Wood v. Cold-Formed Steel
5-Story, Mixed-Use, Multi-Family Residential Comparison
Shipping Container Foundations: Choosing The Right Base
With competitive price and timely delivery, TIANYING sincerely hope to be your supplier and partner.
Suburban Chicago building cost reflects pricing. New Jersey building cost reflects pricing and includes the impact of construction-phase builders risk and general liability insurance premiums.
Source: SFIA and raSmith, Costs to Build with Cold-Formed Steel Versus a Wood-Framed Building
For the NJ project, the Costs to Build report cost comparison shows that a building owner saves more than $100,000 in insurance premiums by using metal framing instead of wood. Thats because the risk and cost of premiums are generally lower with non-combustible construction.
If built in suburban Chicago,² the building would cost:
- $6.257 million with wood framing (about $125/SF)
- $6.420 million only $58,000 more with CFS framing (about $129/SF)²
If built in Morristown, the building would cost:
- $6.402 million with wood framing (about $128/SF)
- $6.461 million, or slightly more, with CFS framing (about $129/SF)
In both cases, the framing represented about 20% of the total building cost.
Other mitigating costs
What some say is a salient cost difference between two materials proves to be insignificant on closer inspection. The cost variance between CFS framing and wood framing drops to less than 1% when insurance is included in the comparison.
Cold-formed steel (CFS) is non-combustible, which reduces the risk of property loss during construction and over the life of the structure. Reduced risk of property loss leads to lower insurance premiums for builders and owners.
Steel Framing Alliance
The Cost to Build report notes that the choice of framing material affects both (1) the insurance premiums and (2) the maximum coverage limits available to a construction project.
The report adds that a mid-rise wood-framed building may not even be insurable. Furthermore, an owner or a contractor may need to purchase multiple policies to have adequate coverage to construct buildings with combustible materials like wood.
Other mitigating costs, not included in the comparison, could lead to CFS being the low-cost leader. These additional cost factors include:
- The cost of property and general liability insurance during the operation of the building
- Lower call-back and maintenance costs associated with CFS
- Steels generally more stable pricing
- CFS framings non-combustible nature
The Costs to Build report suggests that building owners, designers, contractors, and those who develop public policy should consider fire safety when making decisions on framing materials.
Insurance premiums and fire safety
In conclusion, comparing solely the initial cost of framing materials, as the wood industry claims, exaggerates one element of material selection. When the total cost of construction is calculated, and the total includes insurance premiums and fire safety, the true cost of a completed mid-rise building can be properly determined.
Thus, the Cost to Build report establishes the complete picture between CFS and wood. The cost of CFS framing and wood framing is not significantly different in mid-rise structures when additional cost factors are considered.
Download Full Report
Acknowledgements
Patrick Ford, R.A. Smith, created the designs and coordinated the cost estimates with the contractor for the suburban Chicago location. Charles Specht, Constructive Risk, for obtaining insurance quotes. Mark Nowak for compiling the report.
Notes
¹ Antunovich Associates, Chicago, Ill., and R.A. Smith, Brookfield, Wis., designed the 5-story, mixed-use building, which is representative of many residential buildings constructed in the mid-rise market today.
² When considering the framing only, the wood and CFS costs were $21.90/sq.ft and $26.50/sq.ft, respectively. The framing thus represents about 20% of the total building cost in each case. The framing included all bearing wall, floor and roof framing members above the podium (2nd through 5th story); 0.6C metal decking with 1-1/2 LWGC at floors 3 through 5, and 1-1/2 B roof deck for the CFS option; ¾ plywood deck for the wood option, with ¾ gypcrete at the upper floors; and all 5/8 exterior sheathing and all interior non-bearing partition framing for both buildings. Interior drywall, ceiling, and finish work were not included in the framing-only costs.
³ In-place construction costs were determined separately for the total building and the framing for both wood and CFS for the suburban Chicago location. Costs were reflective of the end of . The costs are based on pricing from All-Steel Midrise of Richfield, OH for the CFS version, and TK Architectural Design Services, LLC of Milwaukee for the wood framing.
The impact of the general contractors General Liability (GL) and Builders Risk (BR) policies was considered, and costs were provided by major insurance companies active in New Jersey, adjusting for geographical location and inflation. New Jersey shares the same basic seismic, wind, and climate zone design criteria as suburban Chicago, so no building design adjustments were needed.
Disclaimer
Cost comparisons are affected prices, labor availability, geography, and the economy. Readers should not use a cost report, such as this report, to bid on or make commitments to a specific job. This report provides general insights into the relative costs associated with various methods and materials, and assumes no extreme economic conditions impact material prices, labor, and insurance premiums.
This report is limited to a comparison of the costs between two buildings that only differed in their structural framing material. The structural and nonstructural framing in the floors, walls, and roof were designed using CFS in one building and with wood in the other. The general contractors costs were the basis for the comparison (i.e., cost to the owner and not the sales price). The building was eventually built in suburban Chicago although costs will be examined in different locations around the country where the same building could be constructed with little or no design changes.
Share
If you want to learn more, please visit our website Steel Frame Exhibition Hall.